
275s & 330s Reconditioned
Recondition/DOT Re-certification
Each unit is cleaned with a high pressure and high temperature clean water process. All Accessories are removed, inspected and cleaned separately, then reinstalled before leak testing in order to comply with the RIPA and TPSA guidelines. Each unit receives a final internal and external inspection to ensure product materials are certified to meet DOT requirements under 40 CFR 26.17 and 49 CFR 173.29
