Packaging selection
The shipper must determine that the packaging is authorized and compatible with the material and intended conditions of use.
HAZMAT compliance center
Packaging condition, design type, inspection, testing, marking, maintenance, repair and recordkeeping can all affect whether an IBC is appropriate for a regulated shipment.
Markings, records and responsibility
Packaging design, condition, testing, inspection, maintenance, marking, documentation and the intended material can each affect the questions a shipper must resolve.
Separate the questions
The shipper must determine that the packaging is authorized and compatible with the material and intended conditions of use.
Composite IBCs can be subject to periodic inspection and leakproofness testing requirements based on type and use.
Visible markings and retained records serve related but different functions. Buyers should understand what each actually establishes.
PCC Rule
Covered pesticide IBCs can require specific opening controls, durable identification, DOT capability, registrant documentation and refilling controls. The IBC alone does not establish compliance.
Penalties & responsibility
As verified August 26, 2026, the current eCFR lists a maximum civil penalty of $102,348 per violation and $238,809 when a violation results in specified serious consequences. Each day of a continuing violation can constitute a separate offense.
Beyond penalties
Improper filling, storage, closure, handling or transportation can increase the chance of a hazardous-material release—or make an incident harder to control.
A release can expose employees, carriers, emergency responders and the public to harmful materials, fire or reactive hazards.
Escaped material can contaminate the surrounding environment and require containment, reporting, cleanup and disposal.
Incidents can damage vehicles, facilities, freight and other property while interrupting production, storage or transportation.
Buyer checklist
Primary regulatory sources
Source links reviewed September 2, 2026. The eCFR and agency guidance are updated over time, so users should confirm the provisions applicable to their activity, material, location and date.
Start with the shipment